Stockwell bus garage
Lansdowne Way, Stockwell
1951–4, Adie, Button and Partners
Listed grade II*, 29 March 1988
London’s last trams were withdrawn in 1952, leaving a demand for garages to house the expanded bus fleet. There was steel for garages to replace those destroyed in the war, but for new depots, George Adie and Frederick Button resorted to shell concrete, aided by engineer A. E. Beer.
Peckham’s bus garage, now demolished, repeated the construction popularised at the former bus depot in Bournemouth. Stockwell is also spanned by ten concrete beams linked by thin barrel vaults and a ring beam, although its span of 59.1m (194ft) makes it a third wider than the Bournemouth garage, and it is also longer. The difference is the use of arched portal frames – giant ribs that rise from 4.87m (16ft) to 16.46m (54ft) at their centre.
Between them, the arched cylindrical shells soar still higher, and the cathedral-like effect of their vaults is further enhanced by roof lights. To ensure adequate loadings, the frames’ reinforcement bars were welded rather than lapped – perhaps the roof’s greatest technical novelty. Some 200 buses can be garaged here.
This was first published in 'England's Post-War Listed Buildings' by Elain Harwood and James O. Davies. Read a review of the book and interview with Elain Harwood here.
Read other extracts from the book:
Featured articles
Check out some of the best features and news from Designing Buildings as well as key stories from around the web.
ECA calls for an exemption for contractors working away from home.
Fire performance of thermal insulation
Flat roof assemblies with PV.
Become a Professional Development Partner
CIOB launches a new framework for staff development and chartered membership.
Dorset's first conservation campaigner?
Gov.uk - Hot-rolled steel plate
New anti-dumping measure imposed on South Korea.
ECA responds to the Milburn Report
Youth employment to be linked to workforce demand.
The construction industry urgently needs to attract new talent
CIOB responds to Neets report.
Grenfell Tower community update
Memorial columns to be retained as careful dismantling continues.
When buildings reflected the local resources available.
CIOB reports 57% are using artificial intelligence technologies.
More of England’s ‘hidden heroes’ will be celebrated.
CIAT calls for retrofit to be a priority.